Day-to-Day Track Maintenance Part II: Switches & Crossings (1952)
Synopsis
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
Release Date: 1952-01-02
Runtime: 21 minutes
Director: C. David Lochner
Soundtrack
Original Music Composer(s): N/A
Trailers & Videos
No trailers or videos found.
Images & Backdrops
No additional images or backdrops found.
Where to Watch
No watch providers found for this movie in US.