MBTA Ashmont - Mattapan Line: Traction Volume One (2023)


MBTA Ashmont - Mattapan Line: Traction Volume One Poster

Synopsis

The Ashmont-Mattapan High Speed Line operates 2.6 miles of track from Ashmont Station to Mattapan Station just south of Boston. We capture this neat little commuter operation in the state of Massachusetts. They operate with all PCC trolley cars! This operation offers a vital link to commuters to get to Boston easily from the suburbs of Boston! It is a landlocked line that connects with the Red Line at Ashmont Station! Filmed in 2022 & 2023 at 7 of the 8 stations.


Release Date: 2023-01-01

Runtime: 35 minutes

Soundtrack

Original Music Composer(s): N/A


Trailers & Videos

No trailers or videos found.


Images & Backdrops

Posters


Where to Watch

No watch providers found for this movie in TW.


More Like This