Grafton & Upton Railroad Volume Five (2022)


Grafton & Upton Railroad Volume Five Poster

Synopsis

The latest expansion for the G&U is the acquisition of the Milford Running track, that G&U now has operating rights from Franklin Forge to Milford. The G&U also rebuilt their mainline from Hopedale to Milford. We hop aboard a G&U MP15AC #1160 for a cab ride from Hopedale yard to Milford yard, then we reverse direction and head to Franklin. We then take the head end again and capture the Franklin to Milford on the Milford Running track (Leased from CSX / MBTA) Then we capture action from the ground as we chase the Hopedale to Milford and the Milford Running track! We also capture Foreign power of the G&U and MBTA detour trains!


Release Date: 2022-12-03

Runtime: 87 minutes

Soundtrack

Original Music Composer(s): N/A


Trailers & Videos

No trailers or videos found.


Images & Backdrops

Posters


Where to Watch

No watch providers found for this movie in TW.


More Like This